Interconnection Requirements:

Shown in the lower portion of the right navigation panel of this page are Sawnee’s Dispersed Generation Interconnection policies, agreement, procedure and various related forms and information. Dispersed generation loads may qualify for access to Sawnee EMC’s Net Energy Metering Rate Rider (NEM) (PDF).

Given the unique nature of interconnection requests and loads, all parties interested in interconnecting with Sawnee’s distribution facilities are required to direct all requests to Blake House Vice President of Member Services.

For more information on your solar options, please visit our Photovoltaic Systems (Solar) page.

Interconnection Documents:

Interconnection (Policy 412) -
Sawnee's Dispersed Generation Interconnection Policy (PDF).

Interconnection Procedures -
Sawnee's Dispersed Generation Interconnection Procedure can be obtained by selecting one of the links below:

“Interconnection Notification (PDF)” (for all sizes) Must be filled out by all applicants as notice to interconnect, prior to a system being installed.

“Micro” (PDF) (Not Greater than 2 kW) Distributed Generation Resources

“Small” (PDF) (Residential – Greater than 2 kW and not greater than 10 kW; Commercial – Greater than 2 kW and not greater than 100 kW) Distributed Generation Resources

“Medium” (PDF) (Residential – Greater than 10 kW; Commercial – Greater than 100 kW and not greater than 2 MW) Distributed Generation Resources

“Large” (PDF) (Greater than 2 MW and not greater than 10 MW) Distributed Generation Resources