Sawnee EMC Retail Rate Schedule |
Residential Rate (Schedule H-20) |
Plug-In Electric Vehicle Rate (Schedule PEV-7) |
Residential Time-of-Use Rate (Schedule TU-24) |
Critical Peak Pricing Residential Rate (Schedule CPPR-11) |
Uses your "existing" whole house meter (no additional meter used) |
 |
|
 |
 |
Requires a new meter base and a "dedicated PEV meter" - most likely requires a permit and an inspection |
|
 |
|
|
This rate has a "time-of-use" (TU) component which makes it cost effective to charge the PEV "off peak" |
|
 |
 |
 |
The rate has a cost penalty for an energy consumed "on-peak" |
|
 |
 |
 |
May require an upgrade to your SEMC transformer, service cable or other SEMC facilities |
 |
 |
 |
 |
Requires your involvement to get the "lowest" overall charging cost |
|
|
|
 |